Main tunnel length of 2200M Link up With All Destination Landscaping And Environmental Protection The Northern Footbridge is open

    Project Scope

    Project Scope


    (a)

    Construction of a dual two-lane highway, approximately 3.8 km long (of which about 2.2 km is in the form of tunnel) connecting Po Shun Road of Tseung Kwan O in the east with Eastern Harbour Crossing and Cha Kwo Ling Road of Kwun Tong in the west;

    (b)

    Construction of slip roads, depressed roads, viaducts, Tseung Kwan O Interchange, ventilation building for the tunnel, tunnel portal facilities and reclamation of about 3 hectares of land to construct the depressed roads at Tseung Kwan O;

    (c)

    Construction of slip roads, branch tunnels, viaducts, Lam Tin Interchange, tunnel portal facilities, ventilation building and administration building at Kwun Tong;

    (d)

    Implementation of the associated building, civil, structural, marine, electrical and mechanical, traffic control and surveillance system, landscaping, as well as environmental mitigation measures.

    Back to top
    Last Review Date: Nov 2022
    © Copyright  2015  CEDD.  All rights reserved.
    Please use: Screen with 1024 x 768 resolution
    browser of Internet Explorer 8 or above
    Web for All